Model building bye-laws, 2016.

Contributor(s): Material type: TextTextLanguage: English Publication details: Town and Country Planning Organisation, 2016. S.l.Description: viii, 250 pSubject(s): DDC classification:
  • 307.1216 MOD
Contents:
DEFINITIONS 1 1.0 General -- 1.1 Definitions-- 2. JURISDICTION / APPLICABILITY AND BUILDING DOCUMENTATION PROCEDURES -- 2.1 Jurisdiction of Building Bye Laws --- 2.2 Applicability of Building Bye -- 2.3 Development and part construction -- 2.4 In case of Part construction -- 2.5 Change of use / occupancy -- 2.6 Reconstruction -- 2.7 Existing approved building -- 2.8 Development -- 2.9 Procedure for obtaining building permit -- 2.10 All Plans -- 2.11 Signing of plans -- 2.12 Notice for alteration -- 2.13 Building permit fees -- 2.14 Sanction-- 2.15 Procedure during Construction Work -- 2.16 Notice of Completion -- 2.17 Completion and Permission for Occupation -- 2.18 Occupancy/ Part Completion Certificate -- 2.19 Connection to the municipal sewer / water mains -- 3. DEVELOPMENT CODES -- 3.1 Flexible -- 3.2 Development norms and standards for hill towns -- 3.3 Parking standard -- 3.4 Specific premises -- 3.5 Non-residential premises -- 3.6 Commercial -- 3.7 Industrial plot -- 3.8 Transportation -- 3.9 Aerodromes ]-- 3.10 Public - Semi-public -- 3.11 Educational -- 3.12 Security Services -- 3.13 Post and telegraph office, head post -- 3.14 Farm houses -- 3.15 Professional activity -- 3.16 Socio – cultural facilities -- 4. GENERAL BUILDING REQUIREMENTS AND SERVICES -- 4.1 General -- 4.2 Requirements for Parts of Buildings -- 4.3 Habitable Rooms -- 4.4 Kitchen -- 4.5 Bathrooms and Water-Closets -- 4.6 Ledge or Tand/Loft-- 4.7 Mezzanine Floor -- 4.8 Store Room -- 4.9 Garage-- 4.10 Basement -- 4.11 Chimneys -- 4.12 Parapet -- 4.13 Cabin -- 4.14 Boundary Wall -- 4.15 Septic Tanks -- 4.16 Meter Rooms -- 4.17 Staircase/Exit Requirements -- 4.18 Roofs -- 4.19 Special Requirements of Low Income Housing -- 4.20 Special Requirements for Cluster Planning for Housing -- 4.21 Group housing -- 4.22 Non-residential buildings -- 4.23 Other general requirements -- 4.24 Means of access (Including Fire Safety- Ref Chapter 10) -- 4.25 Provision of exterior open spaces and height limitation around the building -- 4.26 Interior Open Space for Light and Ventilation -- 4.27 Joint Open Air Space -- 4.28 Provision of Podium for parking and landscaping -- 4.29 Exemption to Open Spaces/Covered area -- 4.30 Lighting and ventilation of rooms -- 4.31 Building Services -- 4.32 Plumbing and Sanitary Services -- 4.33 Segregated sanitation for Visitors in Public Buildings -- 4.34 Construction Site -- 4.35 Temporary Camp Toilets -- 4.36 Special / Contingency Toilets-- 4.37 General guidance for water supply arrangements -- 5. PROVISIONS FOR HIGH RISE DEVELOPMENT -- 5.1 High Rise-- 5.2 Peripheral Open Spaces including set backs -- 5.3 Parking Spaces -- 5.4 Building components -- 5.5 Building Services -- 6. PROVISIONS FOR STRUCTURAL SAFETY-- 6.1 Structural design and safety -- 6.2 Structural requirements of low income housing -- 6.3 Inspection -- 6.4 Alternative Materials, Methods of Design and Construction and Tests -- 7. SPECIAL REQUIREMENTS FOR OCCUPANCY/LAND DEVELOPMENT AND OTHER -- 7.1 Industrial Buildings (Factories, Workshops, etc.) - 7.2 Educational Building (School/Colleges) -- 7.3 Assembly Building (Cinema, Theaters, etc.) -- 7.4 Petrol filling station-- 7.5 Burial and cremation grounds -- 7.6 Building in mining area-- 7.7 Poultry farms (wherever allowed as per master plan) -- 7.8 Special buildings not covred -- 7.9 Provisions in the public buildings for handicapped persons -- 7.10 Resettlement and Slum insitu upgradaion -- 7.11 Rules for development of land -- 7.12 Penal action for violation of master plan/zonal plan regulation/bye- laws -- 7.13 Signs and outdoor display structus -- 8. PROVISIONS FOR DIFFERNTLY-ABLED, ELDERLY AND CHILDREN -- 8.1 Applicability-- 8.2 Guidelines and Provisions-- 8.3 Types of buildings to adopt barrier free guidelines as notified by the state government -- 8.4 Building requirements-- 8.5 Stair-ways -- 8.6 Lifts -- 8.7 Toilets-- 8.8 Designing for Children-- 8.9 Drinking Water: -- 8.10 Refuge -- 8.11 Proper signage -- 8.12 Public Building regulations -- 9. RAINWATER HARVESTING -- 9.1 The RWH system -- 9.2 Rainwater harvesting techniques: -- 9.3 Harvesting provisions in various Building categories:-- 9.4 Rain Water Harvesting Provisions for Open spaces in cities -- 9.5 Ground Water Recharge -- 9.6 Enforcement and Monitoring-- 10. GREEN BUILDINGS AND SUSTAINABILITY PROVISIONS -- 10.1 Provisions and Applicability -- 10.2 Provisions for Sanction-- 10.3 Various Guidelines for Green Rating systems -- 11. FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS -- 11.1 Scope -- 11.2 Procedure for clearance from fire service -- 11.3 Renewal of fire clearance -- 11.4 Fee -- 11.5 Fire consulant -- 11.6 Terminology -- 11.7 General-- 11.8 Fire Escapes or External Stairs: -- 11.9 Provision of lifts -- 11.10 Basement -- 11.11 Provision of helipad -- 11.12 Service ducts/refuge chute -- 11.13 Electrical services -- 11.14 Staircase and corridor lights-- 11.15 Air-conditioning-- 11.16 Boiler oom -- 11.17 Alternate source of electric spply-- 11.18 Safety measures in electric sub-station-- 11.19 Fire protection requirements-- 11.20 Static water storage tank-- 11.21 Automatic sprinklers -- 11.22 Fixed carbon di-oxide /foam/dco water spray extinguishing system -- 11.23 Fire alarm system -- 11.24 Control Room-- 11.25 Fire drills and fire orders -- 11.26 Material used for construction of building-- 11.27 Liquefied Petroleum Gas (LPG) -- 11.28 House keeping -- 11.29 Fire prevention -- 11.30 Occupancy restrictions -- 12. CONSERVATION OF HERITAGE SITES INCLUDING HERITAGE BUILDINGS, HERITAGE PRECINCTS AND NATURAL FEATURE AREAS -- 12.1 Applicability-- 12.2 Responsibility of the owners of heritage buildings-- 12.3 Restrictions on development / re-development / repairs etc. -- 12.4 Penalties -- 12.5 Preparation of list of heritage sites including heritage buildings, heritage precincts and listed natural feature areas -- 12.6 Alteration / modification / relaxation in development norms -- 12.7 Heritage precincts / natural feature areas -- 12.8 Road widening -- 12.9 Incentive uses for heritage buildings -- 12.10 Maintaining skyline and architectural harmony -- 12.11 Restrictive covenants -- 12.12 Grading of the listed buildings / listed precincts -- 12.13 Opinion of the Heritage Conservation Committee -- 12.14 Approval to preserve the beauty of the area -- 12.15 Signs and outdoor display structures / including street furniture on heritage sites -- 12.16 Composition of heritage conservation committee -- 12.17 Implications of listing as heritage buildings -- 12.18 Ownership not affected -- 13. STREAMLINING OF BUILDING PLAN APPROVALS -- 13.1 Streamlining the building approval/sanction procedure (Ease of doing business) -- 13.2 Clearances at Master Plan level -- 13.3 Clearances at the Local Authorities -- 13.4 Options for reducing the timelines for approvals: -- 13.5 Risk Based Classification of building proposals -- 13.6 Other Suggestions to enhance ease of doing business:-- 14. CLIMATE RESILIENT CONSTRUCTION: INTEGRATION OF ENVIRONMENTAL CLEARANCES WITH SANCTION. -- 14.1 Environmental conditions for compliance during Building approvals -- ANNEXURE AND APPENDICES -- Appendices to MBBL 2016 -- Annexure I: Guidelines for mitigation of effects of E M R in Built spaces -- Annexure II: Technical Aspects and Options of RWH in built and open spaces--
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Reference Reference Library, SPAB A-1 Reference Collection 307.1216 MOD (Browse shelf(Opens below)) Not for loan G000317
Total holds: 0

DEFINITIONS
1 1.0 General --
1.1 Definitions--
2. JURISDICTION / APPLICABILITY AND BUILDING DOCUMENTATION PROCEDURES --
2.1 Jurisdiction of Building Bye Laws ---
2.2 Applicability of Building Bye --
2.3 Development and part construction --
2.4 In case of Part construction --
2.5 Change of use / occupancy --
2.6 Reconstruction --
2.7 Existing approved building --
2.8 Development --
2.9 Procedure for obtaining building permit --
2.10 All Plans --
2.11 Signing of plans --
2.12 Notice for alteration --
2.13 Building permit fees --
2.14 Sanction--
2.15 Procedure during Construction Work --
2.16 Notice of Completion --
2.17 Completion and Permission for Occupation --
2.18 Occupancy/ Part Completion Certificate --
2.19 Connection to the municipal sewer / water mains --
3. DEVELOPMENT CODES --
3.1 Flexible --
3.2 Development norms and standards for hill towns --
3.3 Parking standard --
3.4 Specific premises --
3.5 Non-residential premises --
3.6 Commercial --
3.7 Industrial plot --
3.8 Transportation --
3.9 Aerodromes ]--
3.10 Public - Semi-public --
3.11 Educational --
3.12 Security Services --
3.13 Post and telegraph office, head post --
3.14 Farm houses --
3.15 Professional activity --
3.16 Socio – cultural facilities --
4. GENERAL BUILDING REQUIREMENTS AND SERVICES --
4.1 General --
4.2 Requirements for Parts of Buildings --
4.3 Habitable Rooms --
4.4 Kitchen --
4.5 Bathrooms and Water-Closets --
4.6 Ledge or Tand/Loft--
4.7 Mezzanine Floor --
4.8 Store Room --
4.9 Garage--
4.10 Basement --
4.11 Chimneys --
4.12 Parapet --
4.13 Cabin --
4.14 Boundary Wall --
4.15 Septic Tanks --
4.16 Meter Rooms --
4.17 Staircase/Exit Requirements --
4.18 Roofs --
4.19 Special Requirements of Low Income Housing --
4.20 Special Requirements for Cluster Planning for Housing --
4.21 Group housing --
4.22 Non-residential buildings --
4.23 Other general requirements --
4.24 Means of access (Including Fire Safety- Ref Chapter 10) --
4.25 Provision of exterior open spaces and height limitation around the building --
4.26 Interior Open Space for Light and Ventilation --
4.27 Joint Open Air Space --
4.28 Provision of Podium for parking and landscaping --
4.29 Exemption to Open Spaces/Covered area --
4.30 Lighting and ventilation of rooms --
4.31 Building Services --
4.32 Plumbing and Sanitary Services --
4.33 Segregated sanitation for Visitors in Public Buildings --
4.34 Construction Site --
4.35 Temporary Camp Toilets --
4.36 Special / Contingency Toilets--
4.37 General guidance for water supply arrangements --
5. PROVISIONS FOR HIGH RISE DEVELOPMENT --
5.1 High Rise--
5.2 Peripheral Open Spaces including set backs --
5.3 Parking Spaces --
5.4 Building components --
5.5 Building Services --
6. PROVISIONS FOR STRUCTURAL SAFETY--
6.1 Structural design and safety --
6.2 Structural requirements of low income housing --
6.3 Inspection --
6.4 Alternative Materials, Methods of Design and Construction and Tests --
7. SPECIAL REQUIREMENTS FOR OCCUPANCY/LAND DEVELOPMENT AND OTHER --
7.1 Industrial Buildings (Factories, Workshops, etc.) -
7.2 Educational Building (School/Colleges) --
7.3 Assembly Building (Cinema, Theaters, etc.) --
7.4 Petrol filling station--
7.5 Burial and cremation grounds --
7.6 Building in mining area--
7.7 Poultry farms (wherever allowed as per master plan) --
7.8 Special buildings not covred --
7.9 Provisions in the public buildings for handicapped persons --
7.10 Resettlement and Slum insitu upgradaion --
7.11 Rules for development of land --
7.12 Penal action for violation of master plan/zonal plan regulation/bye- laws --
7.13 Signs and outdoor display structus --
8. PROVISIONS FOR DIFFERNTLY-ABLED, ELDERLY AND CHILDREN --
8.1 Applicability--
8.2 Guidelines and Provisions--
8.3 Types of buildings to adopt barrier free guidelines as notified by the state government --
8.4 Building requirements--
8.5 Stair-ways --
8.6 Lifts --
8.7 Toilets--
8.8 Designing for Children--
8.9 Drinking Water: --
8.10 Refuge --
8.11 Proper signage --
8.12 Public Building regulations --
9. RAINWATER HARVESTING --
9.1 The RWH system --
9.2 Rainwater harvesting techniques: --
9.3 Harvesting provisions in various Building categories:--
9.4 Rain Water Harvesting Provisions for Open spaces in cities --
9.5 Ground Water Recharge --
9.6 Enforcement and Monitoring--
10. GREEN BUILDINGS AND SUSTAINABILITY PROVISIONS --
10.1 Provisions and Applicability --
10.2 Provisions for Sanction--
10.3 Various Guidelines for Green Rating systems --
11. FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS --
11.1 Scope --
11.2 Procedure for clearance from fire service --
11.3 Renewal of fire clearance --
11.4 Fee --
11.5 Fire consulant --
11.6 Terminology --
11.7 General--
11.8 Fire Escapes or External Stairs: --
11.9 Provision of lifts --
11.10 Basement --
11.11 Provision of helipad --
11.12 Service ducts/refuge chute --
11.13 Electrical services --
11.14 Staircase and corridor lights--
11.15 Air-conditioning--
11.16 Boiler oom --
11.17 Alternate source of electric spply--
11.18 Safety measures in electric sub-station--
11.19 Fire protection requirements--
11.20 Static water storage tank--
11.21 Automatic sprinklers --
11.22 Fixed carbon di-oxide /foam/dco water spray extinguishing system --
11.23 Fire alarm system --
11.24 Control Room--
11.25 Fire drills and fire orders --
11.26 Material used for construction of building--
11.27 Liquefied Petroleum Gas (LPG) --
11.28 House keeping --
11.29 Fire prevention --
11.30 Occupancy restrictions --
12. CONSERVATION OF HERITAGE SITES INCLUDING HERITAGE BUILDINGS, HERITAGE PRECINCTS AND NATURAL FEATURE AREAS --
12.1 Applicability--
12.2 Responsibility of the owners of heritage buildings--
12.3 Restrictions on development / re-development / repairs etc. --
12.4 Penalties --
12.5 Preparation of list of heritage sites including heritage buildings, heritage precincts and listed natural feature areas --
12.6 Alteration / modification / relaxation in development norms --
12.7 Heritage precincts / natural feature areas --
12.8 Road widening --
12.9 Incentive uses for heritage buildings --
12.10 Maintaining skyline and architectural harmony --
12.11 Restrictive covenants --
12.12 Grading of the listed buildings / listed precincts --
12.13 Opinion of the Heritage Conservation Committee --
12.14 Approval to preserve the beauty of the area --
12.15 Signs and outdoor display structures / including street furniture on heritage sites --
12.16 Composition of heritage conservation committee --
12.17 Implications of listing as heritage buildings --
12.18 Ownership not affected --
13. STREAMLINING OF BUILDING PLAN APPROVALS --
13.1 Streamlining the building approval/sanction procedure (Ease of doing business) --
13.2 Clearances at Master Plan level --
13.3 Clearances at the Local Authorities --
13.4 Options for reducing the timelines for approvals: --
13.5 Risk Based Classification of building proposals --
13.6 Other Suggestions to enhance ease of doing business:--
14. CLIMATE RESILIENT CONSTRUCTION: INTEGRATION OF ENVIRONMENTAL CLEARANCES WITH SANCTION. --
14.1 Environmental conditions for compliance during Building approvals --
ANNEXURE AND APPENDICES --
Appendices to MBBL 2016 --
Annexure I: Guidelines for mitigation of effects of E M R in Built spaces --
Annexure II: Technical Aspects and Options of RWH in built and open spaces--










There are no comments on this title.

to post a comment.

Library, SPA Bhopal, Neelbad Road, Bhauri, Bhopal By-pass, Bhopal - 462 030 (India)
Ph No.: +91 - 755 - 2526805 | E-mail: [email protected]

OPAC best viewed in Mozilla Browser in 1366X768 Resolution.
Free counter