Model building bye-laws, 2016.
Material type: TextLanguage: English Publication details: Town and Country Planning Organisation, 2016. S.l.Description: viii, 250 pSubject(s): DDC classification:- 307.1216 MOD
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Reference | Library, SPAB A-1 | Reference Collection | 307.1216 MOD (Browse shelf(Opens below)) | Not for loan | G000317 |
DEFINITIONS
1 1.0 General --
1.1 Definitions--
2. JURISDICTION / APPLICABILITY AND BUILDING DOCUMENTATION PROCEDURES --
2.1 Jurisdiction of Building Bye Laws ---
2.2 Applicability of Building Bye --
2.3 Development and part construction --
2.4 In case of Part construction --
2.5 Change of use / occupancy --
2.6 Reconstruction --
2.7 Existing approved building --
2.8 Development --
2.9 Procedure for obtaining building permit --
2.10 All Plans --
2.11 Signing of plans --
2.12 Notice for alteration --
2.13 Building permit fees --
2.14 Sanction--
2.15 Procedure during Construction Work --
2.16 Notice of Completion --
2.17 Completion and Permission for Occupation --
2.18 Occupancy/ Part Completion Certificate --
2.19 Connection to the municipal sewer / water mains --
3. DEVELOPMENT CODES --
3.1 Flexible --
3.2 Development norms and standards for hill towns --
3.3 Parking standard --
3.4 Specific premises --
3.5 Non-residential premises --
3.6 Commercial --
3.7 Industrial plot --
3.8 Transportation --
3.9 Aerodromes ]--
3.10 Public - Semi-public --
3.11 Educational --
3.12 Security Services --
3.13 Post and telegraph office, head post --
3.14 Farm houses --
3.15 Professional activity --
3.16 Socio – cultural facilities --
4. GENERAL BUILDING REQUIREMENTS AND SERVICES --
4.1 General --
4.2 Requirements for Parts of Buildings --
4.3 Habitable Rooms --
4.4 Kitchen --
4.5 Bathrooms and Water-Closets --
4.6 Ledge or Tand/Loft--
4.7 Mezzanine Floor --
4.8 Store Room --
4.9 Garage--
4.10 Basement --
4.11 Chimneys --
4.12 Parapet --
4.13 Cabin --
4.14 Boundary Wall --
4.15 Septic Tanks --
4.16 Meter Rooms --
4.17 Staircase/Exit Requirements --
4.18 Roofs --
4.19 Special Requirements of Low Income Housing --
4.20 Special Requirements for Cluster Planning for Housing --
4.21 Group housing --
4.22 Non-residential buildings --
4.23 Other general requirements --
4.24 Means of access (Including Fire Safety- Ref Chapter 10) --
4.25 Provision of exterior open spaces and height limitation around the building --
4.26 Interior Open Space for Light and Ventilation --
4.27 Joint Open Air Space --
4.28 Provision of Podium for parking and landscaping --
4.29 Exemption to Open Spaces/Covered area --
4.30 Lighting and ventilation of rooms --
4.31 Building Services --
4.32 Plumbing and Sanitary Services --
4.33 Segregated sanitation for Visitors in Public Buildings --
4.34 Construction Site --
4.35 Temporary Camp Toilets --
4.36 Special / Contingency Toilets--
4.37 General guidance for water supply arrangements --
5. PROVISIONS FOR HIGH RISE DEVELOPMENT --
5.1 High Rise--
5.2 Peripheral Open Spaces including set backs --
5.3 Parking Spaces --
5.4 Building components --
5.5 Building Services --
6. PROVISIONS FOR STRUCTURAL SAFETY--
6.1 Structural design and safety --
6.2 Structural requirements of low income housing --
6.3 Inspection --
6.4 Alternative Materials, Methods of Design and Construction and Tests --
7. SPECIAL REQUIREMENTS FOR OCCUPANCY/LAND DEVELOPMENT AND OTHER --
7.1 Industrial Buildings (Factories, Workshops, etc.) -
7.2 Educational Building (School/Colleges) --
7.3 Assembly Building (Cinema, Theaters, etc.) --
7.4 Petrol filling station--
7.5 Burial and cremation grounds --
7.6 Building in mining area--
7.7 Poultry farms (wherever allowed as per master plan) --
7.8 Special buildings not covred --
7.9 Provisions in the public buildings for handicapped persons --
7.10 Resettlement and Slum insitu upgradaion --
7.11 Rules for development of land --
7.12 Penal action for violation of master plan/zonal plan regulation/bye- laws --
7.13 Signs and outdoor display structus --
8. PROVISIONS FOR DIFFERNTLY-ABLED, ELDERLY AND CHILDREN --
8.1 Applicability--
8.2 Guidelines and Provisions--
8.3 Types of buildings to adopt barrier free guidelines as notified by the state government --
8.4 Building requirements--
8.5 Stair-ways --
8.6 Lifts --
8.7 Toilets--
8.8 Designing for Children--
8.9 Drinking Water: --
8.10 Refuge --
8.11 Proper signage --
8.12 Public Building regulations --
9. RAINWATER HARVESTING --
9.1 The RWH system --
9.2 Rainwater harvesting techniques: --
9.3 Harvesting provisions in various Building categories:--
9.4 Rain Water Harvesting Provisions for Open spaces in cities --
9.5 Ground Water Recharge --
9.6 Enforcement and Monitoring--
10. GREEN BUILDINGS AND SUSTAINABILITY PROVISIONS --
10.1 Provisions and Applicability --
10.2 Provisions for Sanction--
10.3 Various Guidelines for Green Rating systems --
11. FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS --
11.1 Scope --
11.2 Procedure for clearance from fire service --
11.3 Renewal of fire clearance --
11.4 Fee --
11.5 Fire consulant --
11.6 Terminology --
11.7 General--
11.8 Fire Escapes or External Stairs: --
11.9 Provision of lifts --
11.10 Basement --
11.11 Provision of helipad --
11.12 Service ducts/refuge chute --
11.13 Electrical services --
11.14 Staircase and corridor lights--
11.15 Air-conditioning--
11.16 Boiler oom --
11.17 Alternate source of electric spply--
11.18 Safety measures in electric sub-station--
11.19 Fire protection requirements--
11.20 Static water storage tank--
11.21 Automatic sprinklers --
11.22 Fixed carbon di-oxide /foam/dco water spray extinguishing system --
11.23 Fire alarm system --
11.24 Control Room--
11.25 Fire drills and fire orders --
11.26 Material used for construction of building--
11.27 Liquefied Petroleum Gas (LPG) --
11.28 House keeping --
11.29 Fire prevention --
11.30 Occupancy restrictions --
12. CONSERVATION OF HERITAGE SITES INCLUDING HERITAGE BUILDINGS, HERITAGE PRECINCTS AND NATURAL FEATURE AREAS --
12.1 Applicability--
12.2 Responsibility of the owners of heritage buildings--
12.3 Restrictions on development / re-development / repairs etc. --
12.4 Penalties --
12.5 Preparation of list of heritage sites including heritage buildings, heritage precincts and listed natural feature areas --
12.6 Alteration / modification / relaxation in development norms --
12.7 Heritage precincts / natural feature areas --
12.8 Road widening --
12.9 Incentive uses for heritage buildings --
12.10 Maintaining skyline and architectural harmony --
12.11 Restrictive covenants --
12.12 Grading of the listed buildings / listed precincts --
12.13 Opinion of the Heritage Conservation Committee --
12.14 Approval to preserve the beauty of the area --
12.15 Signs and outdoor display structures / including street furniture on heritage sites --
12.16 Composition of heritage conservation committee --
12.17 Implications of listing as heritage buildings --
12.18 Ownership not affected --
13. STREAMLINING OF BUILDING PLAN APPROVALS --
13.1 Streamlining the building approval/sanction procedure (Ease of doing business) --
13.2 Clearances at Master Plan level --
13.3 Clearances at the Local Authorities --
13.4 Options for reducing the timelines for approvals: --
13.5 Risk Based Classification of building proposals --
13.6 Other Suggestions to enhance ease of doing business:--
14. CLIMATE RESILIENT CONSTRUCTION: INTEGRATION OF ENVIRONMENTAL CLEARANCES WITH SANCTION. --
14.1 Environmental conditions for compliance during Building approvals --
ANNEXURE AND APPENDICES --
Appendices to MBBL 2016 --
Annexure I: Guidelines for mitigation of effects of E M R in Built spaces --
Annexure II: Technical Aspects and Options of RWH in built and open spaces--
There are no comments on this title.