Local cover image
Local cover image

Defective construction work and the project team / by Kevin Barrett

By: Material type: TextTextLanguage: English Publication details: John Wiley & Sons, 2008. West Sussex:Description: 214 pISBN:
  • 9780632059294
Subject(s): DDC classification:
  • 343.4207869 BAR-D
Contents:
1. Definition and Categorisation of Defects -- 2. Common Law, Statutory and Contractual Rights -- 3. Contracts: An Overview -- 4. No Contract/Restitution -- 5. Letters of Intent -- 6. Tort: An Overview -- 7. The Defective Premises Act 1972 -- 8. Third Party Rights -- 9. Statutory Requirements -- 10. The Builder's Obligations: Design, Workmanship and Materials -- 11. The Builder's Obligations: Defects Before Completion -- 12. The Builder's Obligations: Defects at Completion -- 13. The Builder's Obligations: Defects Post Completion -- 14. The Professional Team -- 15. Architects and Engineers -- 16. Project Managers, Surveyors and Others -- 17. Compensation -- 18. Termination -- 19. Limitation -- 20. Dispute Resolution -- Table of Cases -- Table of Statutes -- Regulations, Directives, Reports, Rules of Court, Treaties.
Summary: "Defective construction work, whether the result of inadequate design, faulty workmanship or poor materials - or some combination of these failings - is a frequent cause of legal disputes. Someone is usually to blame, either the builder or one or more of the professional consultants, or even the entire project team. It is important therefore that the project team should possess a good working knowledge of their responsibilities and liabilities." "Written by a solicitor with over twenty years of experience of building disputes, this book examines the responsibilities and liabilities of the project team when defects occur. It sets out the background role of the common law and statute and includes detailed discussion of important case law affecting the construction process from inception through to completion, together with a consideration of the impact of letters of intent, 'no contract' situations, and specific provisions of model conditions of contract."
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Text/Reserve Book Text/Reserve Book Library, SPAB F-2 Non Fiction 343.4207869 BAR-D (Browse shelf(Opens below)) Available 004178
Total holds: 0

1. Definition and Categorisation of Defects --
2. Common Law, Statutory and Contractual Rights --
3. Contracts: An Overview --
4. No Contract/Restitution --
5. Letters of Intent --
6. Tort: An Overview --
7. The Defective Premises Act 1972 --
8. Third Party Rights --
9. Statutory Requirements --
10. The Builder's Obligations: Design, Workmanship and Materials --
11. The Builder's Obligations: Defects Before Completion --
12. The Builder's Obligations: Defects at Completion --
13. The Builder's Obligations: Defects Post Completion --
14. The Professional Team --
15. Architects and Engineers --
16. Project Managers, Surveyors and Others --
17. Compensation --
18. Termination --
19. Limitation --
20. Dispute Resolution --
Table of Cases --
Table of Statutes --
Regulations, Directives, Reports, Rules of Court, Treaties.

"Defective construction work, whether the result of inadequate design, faulty workmanship or poor materials - or some combination of these failings - is a frequent cause of legal disputes. Someone is usually to blame, either the builder or one or more of the professional consultants, or even the entire project team. It is important therefore that the project team should possess a good working knowledge of their responsibilities and liabilities." "Written by a solicitor with over twenty years of experience of building disputes, this book examines the responsibilities and liabilities of the project team when defects occur. It sets out the background role of the common law and statute and includes detailed discussion of important case law affecting the construction process from inception through to completion, together with a consideration of the impact of letters of intent, 'no contract' situations, and specific provisions of model conditions of contract."

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image

Library, SPA Bhopal, Neelbad Road, Bhauri, Bhopal By-pass, Bhopal - 462 030 (India)
Ph No.: +91 - 755 - 2526805 | E-mail: [email protected]

OPAC best viewed in Mozilla Browser in 1366X768 Resolution.
Free counter