Construction project management: planning scheduling and controlling / by K.K. Chitkara

By: Material type: TextTextLanguage: English Publication details: TMH, 2011. New Delhi:Edition: 2nd edDescription: xxii, 766p. 1 CD-ROMISBN:
  • 9780070680753
Subject(s): DDC classification:
  • 624.068 CHI-C
Contents:
1.Construction projects management framework-- 2.Planing project work scope and its integration-- 3.Defining project activities-- 4.Project CPM/PERT network analysis -- 5.Precedence network analysis-- 6.Scheduling project work and resources-- 7.Planning construction manpower-- 8.Planning construction materials-- 9.Project construction equipment-- 10.Selecting construction equipment-- 11.Planning construction costs-- 12.Contrctor's construction Budget -- 13.Controlling project integration and work scope -- 14.Controlling resources productivity-- 15.Contractor's project time schedule -- 16.Controlling project time schedule-- 17.Risk management at construction site -- 18.Project management information system.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode Item holds
CD/DVD CD/DVD Library, SPAB Small CD Collection CD109 (Browse shelf(Opens below)) 4 Not for loan CD109
CD/DVD CD/DVD Library, SPAB Small CD Collection CD99 (Browse shelf(Opens below)) 2 Not for loan CD99
CD/DVD CD/DVD Library, SPAB Small CD Collection CD100 (Browse shelf(Opens below)) 3 Not for loan CD100
CD/DVD CD/DVD Library, SPAB Small CD Collection CD64 (Browse shelf(Opens below)) 1 Not for loan CD64
Books Books Library, SPAB G-2 Non Fiction 624.068 CHI-C (Browse shelf(Opens below)) Cop.1 Available 003759
Books Books Library, SPAB G-2 Non Fiction 624.068 CHI-C (Browse shelf(Opens below)) Cop.2 Available 005375
Books Books Library, SPAB G-2 Non Fiction 624.068 CHI-C (Browse shelf(Opens below)) Cop.3 Available 005376
Books Books Library, SPAB G-2 Non Fiction 624.068 CHI-C (Browse shelf(Opens below)) Cop.4 Available 006139
Total holds: 0

1.Construction projects management framework--
2.Planing project work scope and its integration--
3.Defining project activities--
4.Project CPM/PERT network analysis --
5.Precedence network analysis--
6.Scheduling project work and resources--
7.Planning construction manpower--
8.Planning construction materials--
9.Project construction equipment--
10.Selecting construction equipment--
11.Planning construction costs--
12.Contrctor's construction Budget --
13.Controlling project integration and work scope --
14.Controlling resources productivity--
15.Contractor's project time schedule --
16.Controlling project time schedule--
17.Risk management at construction site --
18.Project management information system.

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image

Library, SPA Bhopal, Neelbad Road, Bhauri, Bhopal By-pass, Bhopal - 462 030 (India)
Ph No.: +91 - 755 - 2526805 | E-mail: [email protected]

OPAC best viewed in Mozilla Browser in 1366X768 Resolution.
Free counter